The MGH Conglomerate Two Divisions. One Standard. Production | Defence | Est. 1974.
MGH Production. From the front barrier to the back truss. SIA Approved Contractor, ISO 9001 and BS 8901 Event Sustainability.

Network Planner

This page is the public demonstration version of the MGH event networking planner. When opened it presents a full-screen drawing board, invites the visitor to sketch one or more event areas, and then produces the sort of provisional network diagram a production office might circulate before the proper site walk, the arguments about vehicle routes and the discovery that the only usable cabin is not where the drawing says it is.

Use: click Launch planner if the modal has been dismissed, draw the site outline point by point, complete each area, then generate the map. A sample two-field layout is available for visitors who prefer to start from something already untidy.

Generated network diagram

Generate a plan to review leased circuits, cable runs and reserve uplink positions.

Generated circuit schedule

MediumOriginDestinationNotes

Legend

    Page last updated 10 August 2003. Planner output is illustrative and should be checked against the actual site. Best viewed at 800 by 600